Wyke Farm

Our project work at the Wyke Farms site down in Somerset includes the installation of two new digesters, new roofs on existing digesters and the installation of a new mixer along with replacing the internal pipework. 

St Nicholas Court Farm

The St Nicholas Court Farms project work incorporates Ebbsfleet Farm. A new biogas boiler has been installed along with a new thermal store to assist in running the MKR Metzger digestate evaporator.

Ebbsfleet Farm

The St Nicholas Court Farms project work incorporates Ebbsfleet Farm. A new biogas boiler has been installed along with a new thermal store to assist running the MKR Metzger digestate evaporator

Bromham Biogas

The development at Bromham Biogas in Wiltshire is a full plant design and build project. The entire undertaking includes two digesters, a reception tank, a combi bag – a flexible secondary digester, CHP – combined heat and power generator. The plant will operate as a gas-to-grid site.

Black Dog Biogas

Our project work at Black Dog covered the design, project management, installation and commission of the site as well as the installation of a 637kW Jenbacher CHP engine, the installation of a 599 kW CHP waste heat recovery system. Further project work already scheduled for the future includes a silage clamp roof, a new access […]